10 rotary coupling, Rotary coupling -46, Rotary coupling - sheet 1 of 2 -46 – JLG 660AJ Service Manual User Manual

Page 90

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-46

– JLG Lift –

3121616

3.10 ROTARY COUPLING

Use the following procedure to install the seal kit.

NOTE: Step 1 applies to machines S/N 75606 to Present.

1.

If not already removed, remove axle oscillation valve
from cylinder barrel. The valve spool protrudes into the
barrel and will damage spool and seals if left in place.

2.

Remove snap ring (12) from end.

3.

Remove thrust ring (13) from same end.

4.

Remove center body (10) from housing (11).

5.

Cut off old seals (14,15,17,18).

6.

Assemble lip seals (14) in direction shown in Figure 3-62.,
Rotary Coupling - Sheet 2 of 2.

7.

Reassemble O-ring (18).

8.

Heat cap seals (17) in hydraulic oil for 5 minutes at 300° F
(149° C).

9.

Assemble cap seals over O-rings

10.

Reinsert center body in housing (lube with hydraulic oil).

11.

Replace thrust ring and snap ring.

4

3

4

5

5

3

4

1

4

2

Detail A

6

6

7

4

4

5

1. Rotary Coupling
2. Torque Lug

3. Locknut
4. Flatwasher

5. Bolt
6. Nut

7. Bracket

Figure 3-61. Rotary Coupling - Sheet 1 of 2

Advertising
This manual is related to the following products: