6 function speeds, Machine orientation when doing speed tests, Test notes – JLG 660AJ Service Manual User Manual

Page 19: 7 torque requirements, Function speeds -3, Torque requirements -3, Function speeds (in seconds) -3

Advertising
background image

SECTION 1 - SPECIFICATIONS

3121616

– JLG Lift –

1-3

1.6

FUNCTION SPEEDS

Machine Orientation When Doing Speed Tests

Lift: Boom retracted. Telescope retracted. Lift up, record time,
Lift down, record time.

Swing: Boom at full elevation. Telescope retracted. Swing
turntable off center and stop. Swing opposite direction and
start test when turntable is centered. This eliminates controller
ramp up and down affecting times.

Telescope: Boom at full elevation; Telescope retracted; Tele-
scope out, record time. Telescope In, record time.

Drive: Test to be done on a smooth level surface. Set Drive
Select Switch to 2WD High Engine. Start approximately 25 ft
(7.62 m) from starting point so unit is at maximum speed
when starting test. Record results for a 200 ft. (60.96 m) course.
Drive forward, record time. Drive reverse, record time.

Drive (Above Horizontal): Test should be done on a smooth
level surface. Set Drive Select Switch to 2WD High Engine.
Select Platform Speed Knob out of creep speed. This verifies
switches are working when boom is above horizontal. Results
should be recorded for a 50 ft course. Drive forward, record
time. Drive reverse, record time.

Platform Rotate: Platform level and completely rotated one
direction. Rotate opposite direction, record time. Rotate other
direction, record time.

Articulating Jib: Platform level and centered with boom. Start
with Jib down. Jib up, record time. Jib down, record time.

Lower Lift: Upper Boom horizontal. Telescoped In. Lower Lift
up, record time. Lower lift down, record time.

Lower Telescope: Lower lift fully elevated, upper boom hori-
zontal, telescoped in. Lower telescope out, record time. Lower
telescope in, record time.

Test Notes

1.

Start stop watch with function, not with controller or
switch.

2.

Drive test results reflect 15x19.5 air or foam-filled tires.

3.

All speed tests are run from platform. Speeds do not
reflect ground control operation.

4.

Platform speed knob control must be at full speed
(turned clockwise completely).

5.

Test with oil temperature above 100° F (38° C). Function
speeds vary if hydraulic oil is cold and thick.

6.

Some flow control functions may not work with speed
knob clicked into creep position.

1.7 TORQUE REQUIREMENTS

Table 1-8. Function Speeds (In Seconds)

Function

600A

600AJ

Lift Up

26 - 32

26 - 32

Lift Down

26 - 32

26 - 32

Swing Right & Left*

79 - 101

79 - 101

Telescope In

22 - 30

22 - 30

Telescope Out

35 - 50

35 - 50

Platform Rotate Right & Left**

16 - 25

16 - 25

Jib Up

N/A

22 - 34

Jib Down

N/A

16 - 26

Lower Lift Up

30-38

37-50

Lower Lift Down

22-28

28-38

Drive (2WD & 4WD GM Engine)
Foward and Reverse

30-34

(4.25 MPH)

30-34

(4.25 MPH)

Drive (2WD & 4WD Deutz Engine)
Forward and Reverse

34 - 38

(4.02 MPH)

34 - 38

(4.02 MPH)

Drive above Horizontal
Forward and Reverse

46-54

(0.68 MPH)

46-54

(0.68 MPH)

*Max 10% Difference Between Left & Right
**Max 15% Difference Between Left & Right

Table 1-9. Torque Requirements

Description

Torque Value (Dry)

Interval

Hours

Bearing To Chassis

190 ft-lb

(260 Nm)

50/600*

Bearing To Turntable

190 ft-lb

(260 Nm)

50/600*

Wire Rope

15 ft- lb (20 Nm)

150

Wheel Lugs

170 ft- lb (231 Nm)

150

Engine Mounting Bolts

165 ft-lb (231 Nm)

A/R

Engine Manifold Mounting
Bolts

30 ft-lb (42 Nm)

A/R

*Check swing bearing bolts after first 50 hours of operation and
every 600 hours thereafter. (See Swing Bearing in Section 3.)

Advertising
This manual is related to the following products: