Loop flushing valve, Loop flushing valve -17, Loop flushing spool -17 – JLG 660AJ Service Manual User Manual

Page 61

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121616

– JLG Lift –

3-17

Loop Flushing Valve

REMOVAL

1.

Remove plug (1) and (2) using an 11/16 in internal hex
wrench.

Figure 3-18. Loop Flushing Spool

2.

Remove plug (3) using a 1/4 in hex wrench.

3.

Remove O-rings (4, 5, and 6).

4.

Remove centering springs (7, 8, and 9) using pliers.

5.

Remove spring retaining washers (10 and 11).

6.

Remove shift spool (12).

7.

Remove orifice poppet (13).

INSPECTION

Inspect new O-rings and the sealing area for rust, wear, or con-
tamination. Check springs and poppet for wear.

INSTALLATION

1.

Install orifice poppet (13).

2.

Install shift spool (12).

3.

Install spring retaining washers on springs (10 and 11).

4.

Carefully install centering springs (7, 8, and 9).

5.

Install new O-rings (6, 4, and 5).

6.

Torque plug (3) to 20 ft-lb (27 Nm) using an 1/4 in hex
wrench.

7.

Torque plugs (2 and 1) to 27 ft-lb (37 Nm) using an 11/16
in internal hex.

2

6

9

11

1

4

8

10

12

5

3

7

13

(37 Nm)

27 ft.lbs.

11/16 in

(37 Nm)

27 ft.lbs.

11/16 in

(27 Nm)

20 ft.lbs.

5/8 in

1.

Plug

2.

Plug

3.

Plug

4.

O-ring

5.

O-ring

6.

O-ring

7.

Spring

8.

Spring

9.

Spring

10. Washer

11. Washer
12. Shift Spool
13. Orifice Poppet

Advertising
This manual is related to the following products: