Replace fixed end brackets, Replace fixed end brackets -29 – JLG 660AJ Service Manual User Manual
Page 177
Advertising
SECTION 4 - BOOM & PLATFORM
3121616
– JLG Lift –
4-29
3.
Install new 8-32 x 0.500 self threading screw on other
side. Torque to 18-20 in-lb (2-2.25 Nm).
NOTE: When tightening screws make sure screw head is seated
against link with no space in between link and underside of
screw head.
Replace Fixed End Brackets
REPOSITION CABLES/HOSES. KEEP COVERED DURING GRINDING TO PREVENT
DAMAGE.
1.
Remove rivets as shown in link removal instructions.
Advertising
This manual is related to the following products: