11 generator, Every 250 hours, Every 500 hours – JLG 660AJ Service Manual User Manual

Page 94: Generator -50, Every 250 hours -50 every 500 hours -50, Generator belt tension -50, Generator brushes and slip rings -50, Blow out generator -50, Coupling port information table - 2ws -50, Coupling port information table - 4ws -50

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-50

– JLG Lift –

3121616

3.11 GENERATOR

Every 250 hours

Check drive belt tension every 250 hours of operation,.

Every 500 hours

Service generator brushes and slip rings every 500 hours of
operation. Hostile environments may require more frequent
service.

Blow out inside of generator every 500 hours of service. If
operating in a hostile environment, clean monthly.

Table 3-8. Coupling Port Information Table - 2WS

Port

No.

Outlet

Port

Size

Description

Operating

Pressure
PSI (Bar)

Proof

Pressure
PSI (Bar)

1

1

-8

Brake

450 (31)

675 (47)

2

2

-6

2 Speed

4500 (310)

6750 (465)

3

1

-6

Steer

2500 (172)

3750 (259)

4

1

-6

Steer

2500 (172)

3750 (259)

5

2

-6, -16

Drive Reverse

4500 (310)

6750 (465)

6

1

-16

Drive Forward

4500 (310)

6750 (465)

7

3

-8, -6

Case Drain

250 (17)

375 (26)

Table 3-9. Coupling Port Information Table - 4WS

Port

No.

Outlet

Port

Size

Description

Operating

Pressure
PSI (Bar)

Proof

Pressure
PSI (Bar)

1

1

-8

Brake

450 (31)

675 (47)

2

2

-6

2 Speed

4500 (310)

6750 (465)

3

1

-6

Steer

2500 (172)

3750 (259)

4

1

-6

Steer

2500 (172)

3750 (259)

5

2

-6, -16

Drive Reverse

4500 (310)

6750 (465)

6

1

-16

Drive Forward

4500 (310)

6750 (465)

7

3

-8, -6

Case Drain

250 (17)

375 (26)

8

1

-6

Steer

2500 (172)

3750 (259)

9

1

-6

Steer

2500 (172)

3750 (259)



 

Figure 3-65. Generator Belt Tension

Figure 3-66. Generator Brushes and Slip Rings

Figure 3-67. Blow Out Generator

Advertising
This manual is related to the following products: