JLG X550AJ Operator Manual User Manual

Page 111

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE

3128791

– JLG Lift –

6-9

Figure 6-4. Component Maintenance Intervals - X550AJ - Lithium-Ion Machine

PART

MAINTENANCE

WORK

BEFORE

STARTING

AS NEEDED

INTERVAL (HOURS)

10

50

100

250

500 1000

HYDRAULIC OIL

CHECK LEVEL

CHANGE

HYDRAULIC OIL

FILTER

REPLACE

CARTRIDGE

*

ARTICULATE

JOINT POINTS

GREASING

*

REDUCTION GEAR

OIL

CHECK LEVEL

CHANGE

*

MACHINE

GENERAL PERIODICAL

CHECKS

*

EXTENSION ARM

INTERNAL SLIDING

RING

CHECK WEAR

REPLACE

TURNTABLE BOLT

TIGHTENING

CHECK

*

LITHIUM-ION

MACHINE

First time service interval

then per chart thereafter.

** Every 3 months or
     1000 hrs of operation.

*** Every 5 years or
       2000 hrs of operation.

#

Check every year.
If the torque is not
correct replace the nuts
with two new nuts of
the same specification.
Install dry without
using oil or grease to
specified torque.

Advertising