Assembly -6, Connector assembly (1 of 4) -6, Connector assembly (2 of 4) -6 – JLG M4069 Service Manual User Manual

Page 118: Assembly

Advertising
background image

SECTION 6 - GENERAL ELECTRICAL INFORMATION & SCHEMATICS

6-6

– JLG Lift –

3121639

Assembly

Check to be sure the wedge lock is in the open, or as-shipped, position (See Figure 6-6. Connector Assembly (1 of 4)). Pro-
ceed as follows:

Figure 6-6. Connector Assembly (1 of 4)

1. To insert a contact, push it straight into the appropri-

ate circuit cavity as far as it will go (See Figure 6-7.
Connector Assembly (2 of 4)
).

2. Pull back on the contact wire with a force of 1 or 2

lbs. to be sure the retention fingers are holding the
contact (See Figure 6-7. Connector Assembly (2 of
4))
.

3. After all required contacts have been inserted, the

wedge lock must be closed to its locked position.
Release the locking latches by squeezing them
inward (See Figure 6-8. Connector Assembly (3 of
4)).

4. Slide the wedge lock into the housing until it is flush

with the housing (See Figure 6-9. Connector Assem-
bly (4 of 4)).

Figure 6-7. Connector Assembly (2 of 4)

Advertising
This manual is related to the following products: