JLG 3969electric ANSI Service Manual User Manual

Page 24

Advertising
background image

SECTION 2 - PROCEDURES

2-12

– JLG Sizzor–

3120768

2.16 DRIVE TORQUE HUB

Disassembly

1.

Loosen all cover bolts (28 & 29) and drain oil from
unit.

2.

Remove the cover bolts (28 & 29) and lift off input
cover. Remove and discard o-ring from counterbore
of input cover.

3.

Remove sun gear and thrust washer.

4.

Lift out the carrier and thrust washer.

5.

Remove input spacer.

6.

Lift out internal gear and thrust washer.

7.

While wearing eye protection, remove the retaining
ring from the output shaft and discard.

8.

Remove thrust washer from the output shaft.

9.

The output shaft may now be pressed out of the
housing.

10.

The bearing cups will remain in hub as will the inner
bearing cone. The outer bearing cone will remain on
the output shaft. The lip seal will be automatically
removed during this procedure.

NOTE: If bearing replacement is necessary, the bearing

cups can be removed with a slide hammer puller or
driven out with a punch.

11.

To remove the cluster gears from the carrier, drive
the roll pin into the planet shaft. The planet shaft
may now be tapped out of the carrier. After planet
shaft has been removed, the roll pin can be driven
out.

Figure 2-13. Pressure Setting Procedures

Advertising
This manual is related to the following products: