Disassembly, Disassembly -5 – JLG 800S Service Manual User Manual

Page 51

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121139

– JLG Lift –

3-5

Disassembly

1. Disassemble the pilot valve.

2. Mark the position of the port plate and remove the

socket screw of the port plate.

3. Remove the port plate together with the valve plate

(hold the valve plate so that the plate can’t fall
down).

4. Remove the O-ring.

5. Disassemble the taper roller bearing (near by port

plate).

6. Remove the adjustment shim.

Advertising
This manual is related to the following products: