Assembly, Assembly -9 – JLG 800S Service Manual User Manual

Page 55

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121139

– JLG Lift –

3-9

Assembly

1. Assemble the variable displacement pump in

reverse order.

2. Measurement of the taper roller bearing pretension

(see adjustment figure).

NOTE: There is a correct connection of the piston rod and

swash plate.

3. Pumps clockwise driven must have a position of the

valve plate 4° out of center in the same direction
decentered like drive direction.

NOTE: Spare parts exist as clockwise and counter-clock-

wise valve plates.

4. Pumps anti-clockwise driven must have a position of

the valve plate 4° decentered in counter-clockwise
position.

5. Assembly of the port plate and pump housing:

NOTE: The correct position of the drilling that connects high

pressure to the control valve. Check control valve
drilling position at the pump housing and fit together.

Advertising
This manual is related to the following products: