JLG 19BD Service Manual User Manual

Page 25

Advertising
background image

SECTION 2 - SERVICE PROCEDURES

3121154

– JLG Lift –

2-3

Table 2-2. BD Model - Preventive Maintenance & Inspection Schedule.

AREA ON MACHINE

INTERVAL

(a)

PRE-START (b)

INSPECTION

3 MONTH

PREV. MAINT.

5 Hm. Hrs.

PRE-DELIVERY (c)
OR FREQUENT (d)

INSPECTION

ANNUAL (e)

INSPECTION

20 Hm. Hrs.

MAST ASSEMBLY

Mast Sections

1

2, 5

Chain Systems

1

14

3, 14

14, 25

Sequence Cable Systems

1

3

1, 2, 3

Support Bars

1

1, 2

Covers or Shields

1

1

Sheave Systems

1

1, 2

1, 2

Bearings

1

1, 2

Slide Pads

1

1, 2

PLATFORM ASSEMBLY

Platform

1

1

1

Guard Rails

1

1, 2, 4

1, 2, 4

Gate/Slide Bar

1

1, 5

1, 5

Floor

1

1, 2

1, 2

Lanyard Anchorage Point

1

1, 4

1, 4

CHASSIS ASSEMBLY

Properly Anchored to Work Surface

1

4

FUNCTIONS/CONTROLS

Platform Controls

1

5, 6, 7

5, 6, 7

Ground Controls

1

5, 6, 24

5, 6, 24

Function Control Locks, Guards, or Detents

1

5

5

Function Enable System

1

5

Emergency Stop Switches (Ground & Platform)

1

5

5

Function Limit or Cutout Switch Systems

1

5

Manual Descent or Auxiliary Power

1

5

5

POWER SYSTEM

AC Junction Box Assembly

1

HYDRAULIC/ELECTRIC SYSTEM

Hydraulic Pump

1

1, 2, 9

1, 2, 5, 9

Hydraulic Pump Cover

1

1

Hydraulic Cylinder

1

7, 9

2, 7, 9

2, 9

Cylinder Attachment Pins and Pin Retainers

1

1, 2

1, 2

Hydraulic Hoses, Lines, and Fittings

1

1, 9

Hydraulic Reservoir, Cap, and Breather

1

5, 7

5, 7

Hydraulic Filter

1

Hydraulic Fluid *

11

11

11

Electrical Connections

1

20

20

Advertising
This manual is related to the following products: