JLG 19BD Service Manual User Manual

Page 54

Advertising
background image

SECTION 2 - SERVICE PROCEDURES

2-32

– JLG Lift –

3121154

The mast assembly is now ready to install on the
machines base frame.

Mast Section 4 - Bottom End Components

(Chain Anchor Bracket and Slide Pad Installation)

1. Chain Anchor Bracket 2. Anchor Bracket Bolts/Washers (a) 3. Slide Pad

4. Long Slide Pad

5. Slide Pad Bolts/Washers (a)

Notes: (a) Apply Loctite #242 to threads.

1

3

4

5

3

5

2

4

5

Sequence Cable Bracket Installation

(Bottom End)

Lanyard Attach Installation (OPTION)

(Installed with OPTIONAL Gullwing Platform ONLY)

Advertising
This manual is related to the following products: