Mast section - assembly reference -21 – JLG 19BD Service Manual User Manual

Page 43

Advertising
background image

SECTION 2 - SERVICE PROCEDURES

3121154

– JLG Lift –

2-21

NOTE: When sliding mast sections apart, be careful not to

scratch or score the anodized surface in the slide
pad channels.

5. Carefully slide mast section-4 out the BOTTOM of

mast section-3 rails. Disassemble slide pads, shims
and chain anchor plate from mast section-4, if nec-
essary.

MAST SECTION-3 - REMOVAL

6. Remove chain adjust nuts from threaded ends of

chain attached to the chain anchor plate on BOT-
TOM end of mast section-3. Push threaded ends of
chain through the anchor plate.

7. At TOP of mast section-3, pull chains out and allow

to hang loose, (be certain floor surface is clean and
free of any metal chips or debris which may stick to
lubricated chains)
.

8. Slide mast section-3 out TOP of mast section-2 far

enough to allow access to the chain sheave wheel
assembly.

9. Remove countersunk-flathead screws securing

chain sheave wheel assembly attach bars on both
side rails at TOP of mast section-3 and remove the
sheave wheel assembly.

10. While mast section-3 is still extended from section-2

remove the pin attaching the chain anchor plate to
the TOP of mast section-3. Remove chains.

NOTE: When sliding mast sections apart, be careful not to

scratch or score the anodized finish in the slide pad
channels.

11. Carefully slide mast section-3 out BOTTOM of sec-

tion-2. Remove slide pads, and shims, if necessary.

Figure 2-4. Mast Section - Assembly Reference.

OPEN RAIL

(REFERS TO OPEN RAIL

FRONT OF MAST SECTION)

CLOSED RAIL

(REFERS TO CLOSED RAIL

BACK OF MAST SECTION)

BOTTOM

(REFERS TO BOTTOM END OF

MAST SECTION WHICH SETS IN

MACHINE’S BASE FRAME)

TOP

(REFERS TO TOP END

OF MAST SECTION

WHERE COVER AND

SHEAVE WHEELS

ARE ATTACHED)

Advertising
This manual is related to the following products: