4 order of installation, Industrial pcs opc7008 – ADS-TEC OPC7008 User Manual

Page 15

Advertising
background image

Industrial PCs OPC7008

© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen

15

3.4

O

RDER OF INSTALLATION

I

NTEGRATING THE DEVICE IN AN INSTALLATION RECESS

1)

Before the device can be integrated in the panel, the tensioner fixing screws must be

loosened until the tensioners open.

(Item 1 - item 2).

Note:
Tensioners can be opened by using an Allen key of 3mm size.

Advertising