RDER OF STEPS DURING COMMISSIONING

With 24V DC devices: Connect the power supply
cable with the terminals by using cable end sleeves

Connect cable for serial / parallel data transmission and fasten the screws between
the connector plug and socket

Plug in all other required cables and protect from accidental disconnection

Pos : 21 /D atent ec hni k/I nbetri ebnahme/ Betriebsberei tschaf t prüf en/ Betriebsbereit schaf t prüf en f ür O PC/C PC/ PLC /OTC /ITC/ VMT-Serie(+Monit ore) / I PC 5100/ 5500/ 2400/1100 @ 0\ mod_1158905578361_6. doc @ 381 @

4.4

C

HECK FOR OPERATIONAL READINESS

Check the device for any hidden damage potentially caused by improper transport,
operating or storage conditions or by improper use or handling (e.g. smoke development

from the device, etc.). If any damage is detected, the device must be put out of service
immediately and protected from accidental switch-on.