Example:

To Deploy a High Availability Environment

Step1

Power off and deploy Master and Backup ES-6000, connect both port1 to switch.

(Figure 10-1)

Step2

Connect Master ES-6000 port 2 (HA port) to Backup ES-6000 port 2.

Step3

Don’t power on Backup ES-6000 before you finish the configuration of Master ES-6000.

Step4

Change interface IP address of Master ES-6000 to differ with default IP 192.168.1.1, ex.

192.168.1.2 (Figure 10-2)

Step5

Change Management IP of Master ES-6000 to differ with default IP 192.168.2.1, ex. 192.168.2.2.

(Figure 10-3)

Step6

Make sure the Master ES-6000 and Backup ES-6000 port 1 and port 2 are connected properly.

Step7

Power on the Backup ES-6000, then both ES-6000 will synchronize data and setting.

(Figure 10-4, 10-5)

Step8

It needs to take 10 hours to synchronize the data and setting. (Figure 10-6)

ES-4000 Master

IP:192.168.1.2

HA IP:192.168.2.2

ES-4000 Backup

IP:192.168.1.1

HA IP:192.168.2.1

Port 1(Mail Port)

Port 1(Mail Port)

Port 2(HA Port)

Figure 10-1 The Master device deployment under High Availability mode