Installation instructions – Autoquip SERIES 35 TILTERS User Manual

Page 15

Advertising
background image

15

FLOOR INSTALLATION

1.

Make sure installation area is clean before starting.

2.

If the permanent electrical work is not complete, some means of temporary lines
with an on-off device for the power supply should be set up for testing purposes.

3.

Place the tilter in the installation area.

CAUTION!

When moving the tilter, do not attempt to pick it up by the
platform; it is hinged and could be damaged. Pick up the tilter
from under the base frame ONLY using a strap sling.

4.

Make temporary electrical connections and permanent hydraulic connections.
Raise the tilter approximately one foot using the “UP” button. Then lower it back
to fully collapse, holding the “DOWN” button for approximately 60 seconds.
Repeat this process five to seven times to bleed any air out of the hydraulic
system.

5.

Raise the tilter to the top of its travel and make positioning adjustments. Check
for the proper height. If needed, shim to the desired height. DO NOT “spot”
shim. Shim the full length of the base frame. This will prevent the frame from
sagging under an exceptionally heavy load.

DANGER

!

Do not work under the tilter without Maintenance Device! To
avoid personal injury, NEVER go under the platform until the
load is removed and the platform is securely blocked in the open
position. See "Blocking Instructions" section.

INSTALLATION INSTRUCTIONS

Advertising