Carlin EZ-1/2/3 User Manual

Page 16

Advertising
background image

Carlin part number MNEZ123 Rev. 07/13/11

– 16 –

Model EZ-1/2/3 oil burners — Instruction manual

Wire burner — 40200 primary control

42230 primary control

1. All wiring must comply with:

• In the U.S — the National Electrical Code, ANSI Z223.1/NFPA 54.
• In Canada — the Canadian Electrical Code Part 1, CSA standard C22.1.
• All applicable local codes/standards.

2. Wire the burner following Figure 14 and any special instructions or wiring

diagram provided with the appliance, burner or other components.

3. The burner requires a 120

vac

/60

hz

/single-phase power supply, with at least

a 5-

amp

fuse. The current draw (equipped with Carlin PSC motor) will be ap-

proximately 2.5

amps

.

4. The 40200 ro 42230 thermostat terminals provide a power source. Never ap-

ply external power to these terminals under any circumstances. To avoid this

problem when using zone valves, disconnect field wires from 40200 or 42230

thermostat terminals. Then connect a voltmeter across wires. Operate all zones

and verify that there is never a voltage reading at the meter. A voltage reading

indicates incorrect wiring that must be corrected before attempting to operate

the burner.

5. Make sure the burner and appliance are correctly wired and the line switch is

properly fused for the load.

To start burner

Do not start the burner if the combustion chamber contains

oil or oil vapor.

1. Turn service switch OFF.
2. Perform inspections and checkouts on pages 16 and 17.
3. Slip one end of a 3/16-inch I.D. clear plastic hose over end of bleed valve, the

other end into a container. Then open bleed valve.

4. Set thermostat (operating controls) to call for heat.
5. Turn service switch ON.
6. Bleed oil line until plastic line is free of bubbles; then another 15 seconds longer.

(Should the primary control timing cause a lockout during purging, restart the

burner following the primary control data sheet instructions.)

7. Close bleed valve. The burner should cycle through the sequence given in the

primary control data sheet.

8. Perform primary control flame failure lockout and safety timing tests per instruc-

tions in primary control data sheet.

9. Should control/burner fail to operate correctly, see page 17 for suggestions in

troubleshooting.

4. Wire burner • start burner — 40200 or 42230 primary control

Figure 14 EZ-123 burners wiring using Carlin 40200 or 42230 primary control (see appliance manual or separate wiring

information for burner equipped with a primary control not covered in this manual)

Turn off power to appliance when servicing burner. Failure to comply could result in severe personal injury, death or substantial property damage.

Advertising