Carlin part number MNEZ123 Rev. 07/13/11

– 7 –

Model EZ-1/2/3 oil burners — Instruction manual

2. Prepare site • assemble burner • mount burner

(continued)

Verify combustion chamber

General guidelines

• If retrofitting the burner to an appliance, install the burner in accordance

with the appliance instruction manual, when available. If no specific

application data is available from the appliance manufacturer, apply

the guidelines in Table 3 to check whether the burner is likely to work

acceptably in the application.

• Clean all appliance flues and heating surfaces thoroughly, removing

all soot and scale.

Seal all joints and gaps using furnace cement to prevent excess air infiltration.

Minimum combustion chamber dimensions

• Illustrations A to C in Table 3 show different chamber configurations.

Table 3

Burner retrofit applications — guidelines and minimum dimensions for combustion chambers

Verify clearances

Verify that the burner/appliance will maintain all clearances from combustible
construction and clearances for service/maintenance as required in the appliance
manual and applicable codes.
Verify that the vent system components maintain all necessary clearances to
combustible construction, including the correct design of thimbles and insulation
where penetrating combustible walls.

• Do not attempt to fire the burner in a chamber with dimensions smaller

than shown in Table 3 unless the application has been specifically tested

and listed by the appliance manufacturer and/or Carlin.

• Please notice the special requirements given in Table 3 notes.

Using chamber linings and lightweight chambers

• When using refractory liners or lightweight chambers, use insulating-

type refractory rated 2300°F minimum.

• You must install a target wall liner if flame length is close to the length

of the chamber.

• Use a floor liner when possible. The floor liner will improve firing in most

applications. Extend floor liner 3 to 4 inches up side wall.

• Target wall liners — Corbel the top of target wall liners 1½ to 2½ inches

deep and extend at least 3 to 4 inches above the center of the flame.

• Use pre-formed chamber liners when available.
• For firing rates below 0.75 GPH, it is best to apply in a refractory-lined

or stainless tube (designed for application) chamber. Lining the floor

and target wall of the chamber with lightweight insulating refractory

will accomplish the same.

• When conversion firing coal-fired units, install a combustion chamber in

the ashpit area, or fill ashpit with sand up to 2 inches above the “mud

ring” of a boiler (firing through the door). Install a lightweight refractory

liner on the target wall as in Table 3, Figure C. Make sure the minimum

dimensions comply with those listed.

A. Conversion firing coal-fired units

1. Install a combustion chamber in the ashpit area, or fill

ashpit with sand up to 2 inches above the “mud ring”

of a boiler (firing through door).

2. When firing through door, install a lightweight refractory

“target” on the rear wall, as shown.

B. Conversion firing dry-base units

1. Applies to brick, refractory, precast and preformed

refractory fiber chambers. Lightweight, insulating-type

materials are preferred because of their quick warm-up.

Use material rated at least 2300°F.

2. Dimensions in the table can be exceeded without much

effect for dry-base units.

C. Conversion firing wet-based units

1. Apply recommendations here to prevent flame from

impinging on surfaces or being cooled too much by the

cool walls of the heat exchanger. Do not exceed dimen-

sions of table more than 50% to avoid flame chilling.

2. Install a ceramic fiber floor liner (extended 3 to 4 inches

up the side walls) and a ceramic fiber rear target the

full width of the back wall as well. Corbel the top of

the target 1½” to 2½” deep and extend at least 3 to 4

inches above the center of the flame. Use preformed

chambers and/or target walls if available.

3. Set the fuel unit pressure for approximately 150 PSIG

and use a nozzle rated about 20% less than the firing

rate to compensate for the higher pressure. This will

improve atomization, making the flame more intense,

shorter and hotter. Use a head bar matched for the

nozzle size, but set the air band to match the firing

rate.

1

Firing rate

2
L

3

W

4

C

5

H

6

DV

GPH

Inches

Inches (3)

Inches

Inches

Inches (5)

0.50

7

6

3

8

7

0.65

7.5

7

3.5

9

7.5

0.75

8

7

3.5

9

8

0.85

9

7

3.5

9

8.5

1.00

10

8

4

10

9

1.10

11

8

4

10

9.5

1.25

12

8

4

10

10

1.35

13

8

4

10

11

1.50

14

8

4.5

11

12

1.65

15

9

4.5

11

13

1.75

16

9

4.5

11

14

2.00

17

9

4.5

11

15

2.25

18

10

5

12

16

2.50

19

10

5

12

17

Notes

1 Some tested appliances operate well with dimensions other than above.

2 Generally, the application should be acceptable for dimensions as large as 50%

greater than the above.

3 Horizontal cylinder chambers should have a diameter at least as large as the

dimension in column 3.

Horizontal steel cylinder chambers should have diameters at least 1 to 4 inches

larger than the dimension in column 3.

4 Wing walls are not recommended. Corbels can be beneficial to heat distribution

in some appliances.

5 DV is the minimum diameter for vertical cylinder chambers.