Installation instructions – CHAMPION EUCCW Series User Manual

Page 49

Advertising
background image

41

Drain Connection

Steam and condensate connection

Hot water connection

THE MAIN INCOMING HOT WATER AND STEAM

SUPPLY CONNECTIONS ARE MADE

IN THE LOWER PART OF "D" SECTION

ATTENTION INSTALLERS AND SUPERVISORS

REFER TO THE PLUMBING & ELECTRICAL

CONNECTION DIAGRAM FOR THE LOCATION

AND SIZE OF ALL UTILITIES.

BUILDING VENTILATION CONNECTIONS

ARE MADE AT THE TOP OF THE "A" AND "D"

SECTIONS.

BUILDING VENTS MUST ALIGN WITH THE

DISHWASHER CENTER-LINE AND MATCH THE

SIZE OF THE DISHWASHER VENT DUCTS.

IMPORTANT

Main utility supply connections must

be performed by licenced tradesmen who abide

by local building, health and sanitation codes or

national codes in the absence of local codes.

_________ Installation Instructions

Supply Connections

Supply Connections

Advertising