_________ Installation Instructions

Initial Start-up

Supply Connections

Perform the following checks and adjustments before placing the machine into service.

Check the interior of the machine and remove any foreign material.

Check the exterior of the machine — make sure that the conveyor belt is free of tape and

foreign material.

Baffles –

Tank baffles redirect the flow of water from the spray arm systems back into the tanks. This

prevents water loss and keeps the wash, rinse, and final rinse water in the proper tank.

Check the baffles — make sure that they are installed and positioned correctly.

Close the tank drain valves along the lower front of the machine.

Open the water supply valves. Check for leaks and take corrective action as required.

Open the steam supply valves (if applicable). Check for leaks and take corrective

action if required.

Turn the main power on at the breaker panel or fused disconnect switch.

Machine main power

Electric booster main power (if applicable)

Flip the Power Switch on the front of the Control Cabinet to the "ON" position.

The Red power on light will illuminate.

The machine will begin to fill with water.

Allow the machine to completely fill with water.

The water will shut off automatically.

Check for leaks and take corrective action if required.

Monitor the tank thermometers for the proper temperature reading.

Allow sufficient time for the tank heat to reach operating temperature.

Each temperature gauge is marked with its proper operating range.

Move the conveyor shut-off shelf located at the end of the unload section toward the

machine. This resets the automatic conveyor stop system.

When an object on the conveyor contacts the shut-off shelf, the conveyor stops.

Press the GREEN start button on the front of the control cabinet.