Procedure for replacement of sub-duct collets, Sub-duct clamp collets – General Machine Products 89004 Portable Powered Duct Rod Pusher User Manual

Page 25

Advertising
background image

Page 25 of 40

General Machine Products Co., Inc.

8. PROCEDURE FOR REPLACEMENT OF SUB-DUCT COLLETS

THE MACHINE IS SUPPLIED WITH COLLETS FITTED FOR 1 1/4” SDR SUB DUCT.

SUB-DUCT CLAMP COLLETS

Tools Required 4mm Allen Key

Step 1 Collet Removal
a. Open the sub-duct clamp.
b. Remove the socket head cap screws (2) – using a 4mm allen key and remove the collet

(2).

Step 2 Collet Refitting
a. Select he replacement collets
b. Clean the sub-duct clamp with a dry cloth.

c.

Fit the required collets and secure with a socket head cap screws – using a 4mm allen
key.

d.

Close the sub-duct clamp.

Advertising