INFICON Front Load Single Sensor User Manual

Page 61

Advertising
background image

3 - 3

PN

07

4-

15

6N

Front Load Single and Dual Sensors Operating Manual

INFICON CF40 (2-3/4 in. ConFlat) feedthroughs with air lines are equipped with a
fitting adapter (PN 007-133). This adapter provides an easy way to attach
a quick disconnect fitting (included with the 750-420-G1 Solenoid Valve)
to the feedthrough air line.

Follow the steps below:

1

Install the Feedthrough.

2

Add the valve bracket (modified) to the desired location (shown in

Figure 3-3

on page 3-6

) using two of the 6.35 mm (1/4 in.) clamp bolts located on the

flange.

3

Tighten the flange bolts.

4

Remove the quick disconnect air fitting from the exhaust port of the
solenoid valve and thread it into the fitting adapter (PN 007-133)
installed on the feedthrough air line.

5

Connect the 3.175 mm (1/8 in.) air tube from the A port of the solenoid valve to
the quick disconnect fitting installed in step 4 (see

section 3.4, Pneumatic

Connections, on page 3-4

).

6

Attach the P port of the solenoid valve to a source of air. The air supply range
is 70 psi (gauge) {85 psi (absolute)} (5.8 bar (absolute)) [584 kPa (absolute)]
(minimum) to 80 psi (gauge) {95 psi (absolute)} (6.5 bar (absolute))
[653 kPa (absolute)] (maximum) (see

section 3.4, Pneumatic Connections, on

page 3-4

).

WARNING

Do not exceed 100 psi (gauge) {115 psi (absolute)}
(7.9 bar (absolute)) [791 kPa (absolute)].

Connection to excessive pressure may result in personal
injury or equipment damage.

CAUTION

Maximum temperature for the solenoid valve assembly
is 105°C for bakeout and operation.

7

Make electrical connections to the solenoid valve (see

section 3.5, Electrical

Connections, on page 3-4

)

Advertising
This manual is related to the following products: