Open the cardboard box.
•
Remove all foam material.
•
Take out all accessories and the instruction manual.
Do not carry the instrument holding it at movable parts!
•
To lift the instrument from the box, hold it at the lower part of the housing and
place it on a stable, vibration-free laboratory table.
6.2
Site requirements
The installation site must meet the following requirements:
-
Stable, plane surface
-
Room temperature always between +10 °C and +40 °C
-
Relative air humidity should not exceed 80 %.