Open the cardboard box.

•

Remove all foam material.

•

Take out all accessories and the instruction manual.

Do not carry the instrument holding it at movable parts!

•

To lift the instrument from the box, hold it at the lower part of the housing and
place it on a stable, vibration-free laboratory table.

6.2

Site requirements

The installation site must meet the following requirements:

-

Stable, plane surface

-

Room temperature always between +10 °C and +40 °C

-

Relative air humidity should not exceed 80 %.

6.

Unpacking and Setup

6.1

Unpacking

First check the shipment for external damages upon arrival. If it is evident
that the shipment was damaged during transport, please make a claim to the
carrier immediately.