Unpacking and setup, 1 unpacking, 2 site requirements – Leica Biosystems SM2000R User Manual

Page 11: Unpacking, Site requirements

Advertising
background image

11

Open the cardboard box.

Remove all foam material.

Take out all accessories and the instruction manual.

Do not carry the instrument holding it at movable parts!

To lift the instrument from the box, hold it at the lower part of the housing and
place it on a stable, vibration-free laboratory table.

6.2

Site requirements

The installation site must meet the following requirements:

-

Stable, plane surface

-

Room temperature always between +10 °C and +40 °C

-

Relative air humidity should not exceed 80 %.

6.

Unpacking and Setup

6.1

Unpacking

First check the shipment for external damages upon arrival. If it is evident
that the shipment was damaged during transport, please make a claim to the
carrier immediately.

Advertising