2 before switching on, 1 servo motor parameters, Before switching on – Lenze SDSGS User Manual

Page 34: Servo motor parameters, Commissioning and operation

Advertising
background image

Commissioning and operation

Before switching on
Servo motor parameters

7

l

34

BA 13.0011−EN 1.0

7.2

Before switching on

)

Note!

Before switch−on, you must ensure that the motor starts with the intended
direction of rotation.
Lenze motors rotate CW (looking at the driven shaft) if a clockwise three−phase
field L1

W U1, L2 WV1, L3 W W1 is applied.

Before initial commissioning, before commissioning after an extended standstill period, or
before commissioning after an overhaul of the motor, the following must be checked:

ƒ

Measure the insulation resistance, in case of values

£1 kWper volt of rated voltage, dry

the winding.

ƒ

Have all screwed connections of the mechanical and electrical parts been firmly
tightened?

ƒ

Is the unrestricted supply and removal of cooling air ensured?

ƒ

Has the PE conductor been connected correctly?

ƒ

Have the protective devices against overheating (temperature sensor evaluation)
been activated?

ƒ

Is the controller correctly parameterised for the motor?
(

^ Controller operating instructions)

ƒ

Are the electrical connections o.k.?

ƒ

Does the motor connection have the correct phase sequence?

ƒ

Are rotating parts and surfaces which can become very hot protected against
accidental contact?

ƒ

Is the contact of good electrical conductivity if a PE connection on the motor housing
is used?

7.2.1

Servo motor parameters

Motor
SDSGS

LL

Code for 9300 and 9400

Mains voltage / AC current

C86

035−22

210 V AC

1409

360V AC

1413

047−22

210 V AC

1410

360V AC

1414

056−22

210 V AC

1411

360V AC

1415

063−22

210 V AC

1412

360V AC

1416

Advertising