Commissioning and operation
6.1
Important notes
(
Stop!
The drive may only be commissioned by skilled personnel!
¯
Take safety measures prior to any operation:
–
Disconnect the machine from the mains, ensure standstill of the drive system
and avoid any machine movement.
6.2
Before switching on
Please check:
¯
Drive function - machine function assignment
¯
The direction of rotation of the drive shaft
g500−B 2−stage
g500−B 3−stage
¯
Does the drive appear undamaged?
¯
Is the mechanical fixing o.k.?
¯
Is the electrical connection correct?
¯
Are all rotating parts and surfaces that may become hot protected against
contact?
¯
For gearboxes with breathing:
–
Has the transport locking device been removed?