Before switching on
EDKMF2102 DE/EN/FR 7.1
74
l
H1inbet−bevor
7
Commissioning
Before switching on
(
Stop!
Before switching on the standard device with the communication module for
the first time, ...
ƒ
check the entire wiring with regard to completeness, short circuit, and
earth fault;
ƒ
when using the communication module EMF2102IBC−V003 (LECOM−LI),
check the position of the selector for the required output power (