5 commissioning, Before switching on, Commissioning 32 – Lenze E82ZAFFC010 User Manual
Page 32
Advertising
![background image](/manuals/565948/32/background.png)
5
Commissioning
Before switching on
EDK82ZAFFC−010 DE/EN/FR 5.0
32
l
H1inbet−bevor
5
Commissioning
Before switching on
(
Stop!
Please check the entire wiring with regard to completeness, short circuit and
earth fault, before you switch on the basic device with function module for the
first time in the AS−i network.
Advertising