Connect spring-operated brake, Electrical installation – Lenze E82ZWBRU User Manual
Page 41
![background image](/manuals/565955/41/background.png)
5
Electrical installation
Connect spring-operated brake
EDK82ZWBRU DE/EN/FR 2.0
41
L
15m
m
1
2
3
1
4
2
3
0 1
2 3
4
-18-
82ZWBRU007
Screw cap
Crown
Sealing rubber
Splicing ring
Contact carrier
Splicing ring assignment
Control of spring-loaded brake
1 / 3
Spring-loaded brake is switched by control input
1 / 2
Spring-loaded brake is switched by mains voltage (control input
is without function)
Assembly and connection of brake line
1. Remove 15 mm of cable sheathing.
2. Push screw cap
, crown and sealing rubber onto cable.
3. Insert core ends in the entry of the splicing ring
. The entries are labelled with 1, 2,
3. Cut off projecting core ends (the maximum projection of the core ends from the
splicing ring must not exceed 2 mm).
4. Insert the prepared conductor in the contact carrier
and tighten screw cap .
Note!
The splicing ring is coded and will only fit in one position.
Show/Hide Bookmarks