7 commissioning, Before switching on, Switch position – Lenze E82ZAFBC001 User Manual

Page 42: Commissioning 42, 7commissioning

Advertising
background image

7

Commissioning

Before switching on

EDK82ZAFBC−001 DE/EN/FR 7.2

42

l

H1inbet−INB_01_warn

7

Commissioning

Before switching on

Commissioning depends on the device combination (bus−I/O and fieldbus function
module). The commissioning procedure is described in the documentation on the fieldbus
system and the frequency inverter.

Switch position

1

ON

2 3 4 5

ON

OFF

)

Note!

DIP switch and C0034 must be set for the same value range, otherwise the
analog input signal at X3/8 will be interpreted incorrectly by the standard
device.

If a setpoint potentiometer is internally supplied through X3/9, the DIP switch
must be set to a voltage range of 0 ... 5 V. Otherwise it is not possible to use the
whole speed range.

Signal at X3/8

Switch position

C0034

1

2

3

4

5

0 ... 5 V

OFF

OFF

ON

OFF

OFF

0

0 ... 10 V (Lenze setting)

OFF

OFF

ON

OFF

ON

0

0 ... 20 mA

OFF

OFF

ON

ON

OFF

0

4 ... 20 mA

OFF

OFF

ON

ON

OFF

1

4 ... 20 mA

Open−circuit
monitoring

OFF

OFF

ON

ON

OFF

3

−10 V ... +10 V

ON

ON

OFF

OFF

OFF

2

Advertising