7 commissioning, Before switching on, Switch position – Lenze E82ZAFBC201 User Manual
Page 41: Commissioning 41, Commissioning
![background image](/manuals/565982/41/background.png)
Commissioning
Before switching on
7
EDK82ZAFBC−201 DE/EN/FR 5.0
41
l
H1inbet−−−−(DUMMYSEITEVOR)−−−
7
Commissioning
Before switching on
Commissioning depends on the device combination (bus−I/O and fieldbus function
module). The commissioning procedure is described in the documentation on the fieldbus
system and the frequency inverter.
Switch position
1
ON
2 3 4 5
ON
OFF
)
Note!
DIP switch and C0034 must be set for the same value range, otherwise the
analog input signal at X3/8 will be interpreted incorrectly by the standard
device.
If a setpoint potentiometer is internally supplied through X3/9, the DIP switch
must be set to a voltage range of 0 ... 5 V. Otherwise it is not possible to use the
whole speed range.
Signal at X3/8
Switch position
C0034
1
2
3
4
5
0 ... 5 V
OFF
OFF
ON
OFF
OFF
0
0 ... 10 V (Lenze setting)
OFF
OFF
ON
OFF
ON
0
0 ... 20 mA
OFF
OFF
ON
ON
OFF
0
4 ... 20 mA
OFF
OFF
ON
ON
OFF
1
4 ... 20 mA
Open−circuit
monitoring
OFF
OFF
ON
ON
OFF
3
−10 V ... +10 V
ON
ON
OFF
OFF
OFF
2