6 commissioning, Commissioning – Lenze EPZ-10202 User Manual

Page 17

Advertising
background image

Commissioning

EDK10202EZ3 DE/EN/FR 5.1

17

l

H1inbet−Info_en

6

Commissioning

(

Stop!

Before switching on the supply voltage, check the entire wiring concerning
completeness and short circuit.

Switching on:
1. Switch on the supply voltage for Drive PLC and extension board

– The extension board is detected automatically.

2. Load Drive PLC Developer Studio (DDS) project in the Drive PLC

– See documention for DDS and Drive PLC.

3. The additional inputs and outputs are now available for the control. The control is

ready for operation.

Note for Drive PLC with software version as of version 6.1:

The Drive PLC detects automatically
ƒ missing connections to the extension board.
ƒ an extension board which is not compatible with the user program.
ƒ a missing extension board.

Note for Drive PLC with software version before version 6.1:

The Drive PLC does not automatically detect
ƒ missing connections to the extension board.
ƒ an extension board which is not compatible with the user program.
ƒ a missing extension board.

Missing connections, incompatibility or missing extension boards can result in undefined
actions which can endanger the machine/system.

Therefore it is absolutely necessary to ensure that
ƒ the extension board is always connected with both 26−pole plug connectors to the

Drive PLC (see Mounting Instructions of extension board, chapter Mechanical
installation", plug connectors

1).

ƒ the extension board type matches the user program.

)

Note!

ƒ

Lenze makes function blocks available to you which can be loaded into
your application program for the Drive PLC. This enables the Drive PLC to
detect missing connections or non−compatible extension boards and to
output an error message.

ƒ

The function blocks can be downloaded from the Lenze homepage.

Advertising