7 commissioning, Before switching on, Commissioning 40 – Lenze E82ZAFSC100 User Manual
Page 40
Advertising
7
Commissioning
Before switching on
EDK82ZAFSC−100 DE/EN/FR 3.0
40
l
H1inbet−bevor
7
Commissioning
Before switching on
)
Note!
ƒ
If you carry out the commissioning with a configuration different from the
Lenze setting, read the instructions on "Individual Settings" (
^ 42).
ƒ
Make sure
– that you have correctly set the setpoint range with the DIP switch on
the function module (
^ 41).
– that C0034 is adjusted to the settings of the DIP switch (
^ 41).
Example: setpoint selection (0 V ... +5 V) via potentiometer at X3/7,
X3/8 and X3/9
ð
C0034 = 0, DIP switch 1, 2, 4 and 5 = OFF, 3 = ON
Advertising