Commissioning steps

EDK82ZAFSC−100 DE/EN/FR 3.0

42

l

H2_Inbetriebnahmeschritte−INB_01_warn

Commissioning steps

Step

Procedure

Description

1.

Switch on the mains
voltage.

The basic device will be ready for operation after approx.
1 second.
The controller inhibit is active.

Drive response:
The green LED is blinking.
Keypad:

dc

(if attached)

2.

Control digital inputs.

Lenze setting:

l

CW rotation:
– E1, E2, E3, E4: LOW

l

CCW rotation:
– E1, E2, E3: LOW
– E4: HIGH

Individual setting:

l

Adapt digital inputs under C0007 or C0410.

l

The digital inputs must be controlled so that the drive
can start via terminal after controller enable.

3.

Provide a setpoint

Lenze setting:
Setpoint: 0 ... +10 V

Individual setting:

l

Depending on the position of the DIP switch at the
function module
– apply master current to X3/8 or
– Apply master voltage at X3/8.

l

Check C0034.

4.

Release the controller via
the terminal.

Lenze setting:
X3/28 = HIGH (+12 ... +30 V)

Drive response:

l

The green LED is on.

l

Keypad:

c

goes off.

5.

The drive should be running now.