Assembly – Marshalltown SP684 SURFACE SHARK Surface Planer User Manual

Page 11

Advertising
background image

SP684 SuRFACE ShARK SuRFACE PLANER

PAGE 11

ASSEMBLY

The SP684 SuRFACE ShARK Surface Planer is

shipped from the factory secured on a specially

designed wooden pallet and protected from external

damage by a corrugated carton or wood crate. If

shipped with a corrugated carton, the Surface Planer

can be secured to the pallet by wood laths nailed to the

pallet body. Remove the carton or crate immediately

upon receipt using suitable tools to remove the nails.

WEAR SAFETY GLASSES AND OTHER

APPROPRIATE SAFETY APPAREL WHEN CUTTING

THE STEEL BANDING AND/OR REMOVING THE

CORRUGATED/WOOD SHIPPING CRATE.

REMOVING THE SURFACE PLANER FROM THE

PALLET

Application: SP684 Surface Planer

Tools Required:

1 each, pliers

1 each, claw hammer or hammer and an appropriate

pry bar

2 each, 1/2 inch wrenches

The Surface Planer is secured to the pallet with steel

banding. using the pliers, cut and remove the banding.

The Surface Planer is secured to the pallet with a tie-

down clamp. using the 1/2 inch wrenches, remove

the tie-down clamp. The Surface Planer can then be

removed from the pallet.

visually inspect the shipment for freight damage

and/or missing parts. If shipping damage is evident,

contact the delivering carrier immediately to arrange

for an inspection of the damage by their claims

representative. Federal law requires that a claim be

filed within a specific time period. If missing parts

are detected, notify your dealer who will assist you in

obtaining them.

The Surface Planer is shipped from the factory

completely assembled. If ordered with the Surface

Planer, the flail drum and flail kit are normally installed

on the flail drum driveshaft. Additional flail drums and

flail kits or replacement parts are normally shipped

separately.

Check all fasteners for security. Consult a fastener

torque chart for the proper torque value if any fastener

is found to require retorquing.

FILLING THE ENGINE CRANKCASE WITH OIL

Application: SP684 Surface Planer

Note: The Surface Planer is test run at the factory

and is subject to a number of operational tests before

shipment. This requires the engine crankcase to be

filled with oil to the proper level. No further addition of

oil is required prior to placing a new unit in service. In

normal operational service, to fill the engine crankcase

with oil after first draining the crankcase, proceed as

follows:

Tools Required:

1 each, small, clean funnel

1)The SP684 Surface Planer is available equipped

with a number of industrial quality, gasoline and diesel

engines. Consult the material supplied by the engine

manufacturer for the engine that has been ordered with

your Surface Planer. Carefully review this material to

become familiar with specific operating characteristic,

recommendations and service requirements.

2) Determine the location(s) of both the oil filler and oil

drain plug(s).

3) Wipe oil, dust and accumulated dirt from the filler

plug area.

4) using the funnel, fill the engine crankcase with a

high grade motor oil. Consult the material supplied by

the engine manufacturer for proper amount, weight

and service classification.

5) Replace the oil filler plug and tighten. Wipe off any

excess oil spilled on the engine crankcase and Surface

Planer.

6) Do not operate the engine unless proper oil level is

maintained as per the material supplied by the engine

manufacturer.

Advertising