5) belt alignment is checked with the straightedge.

Place the straightedge squarely against the driveshaft

pulley. Properly aligned pulleys should also place

the straightedge squarely against the engine pulley,

FIGuRE 29. Remove the straightedge and rotate the

engine pulley 120 degrees. Recheck alignment with

the straightedge. Repeat the process until the engine

pulley is rotated a full 360 degrees. Maximum allowable

misalignment is +- 1/32 inch. If pulley alignment is

not within specifications, refer to INSTALLING A

REPLACEMENT V-BELT OR PULLEY for specific

information.

6) Install the belt guard to the main frame. Install the

flat washers and self-locking hexagon nuts. Torque

the nuts to 35 ft lbs (47 N.m). Determine that all

safety related decals affixed to the belt guard are fully

readable. If any decal is not fully readable, replace with

a factory approved, replacement part only.

7) If the Surface Planer is powered by an engine,

reconnect the engine spark plug wire. If powered

by an electric motor and the machine is to be used

immediately, reconnect the extension cord or Surface

Planer to the power source. Determine that the oN/

oFF switch located on the operator handle is in the

oFF position.

UNEXPECTED MACHINE START UP CAN RESULT

IN PROPERTY DAMAGE AND/OR PERSONAL

INJURY.

FIGuRE 29

INSTALLING A REPLACEMENT V-BELT OR

PULLEY

Application: SP684 SURFACE SHARK

Tools Required:

1 each, 7/16 inch wrench

2 each, 1/2 inch wrenches

1 each, 9/16 inch wrench

1 each, 16 inch minimum length straightedge

1 each, 10 lbs minimum capacity, tension scale or

belt tension tool

1 each, torque wrench, 35 ft lbs (47 Nm.) capacity

with 7/16 inch and 9/16 inch sockets

Parts Required:

1 each, Part# M3vX335 v-belt (if required)

1 each, Part# MSP8-0221 bushing (if required)

1 each, Part# MSP8-0280 bushing (if required)

1 each, Part# MSP8-0360 bushing (if required)

1 each, Part# MSP8-0270 sheave (if required)

1 each, Part# MSP8-0201 sheave (if required)

1 each, Part# MSP8-0211 key (if required)

1) If the Surface Planer is powered by an engine,

disconnect the spark plug wire. If powered by an electric

motor, disconnect the extension cord or Surface Planer

from the power source.

2) Position the Surface Planer on a suitable work

surface with the v-belt approximately at waist level.

3) using the 9/16 inch wrench, remove the belt guard

from the main frame. Clean the inside of the belt guard

with an appropriate solvent. Check for signs of wear

and damage.