Cx-3, Operation – MK Diamond CX-3 User Manual
Page 18

18
CX-3
®
OPERATION
Standard Operation
The following is a brief overview of operating the CX-3
®
.
(A)
Use the depth control wheel to
raise the blade clear of the floor.
(B)
Attach the cooling supply
hose to the Cooling Inlet.
(C)
Lower the Pointer. Align a straight-
edge with a blade. Loosen thumb-
screw on front of Pointer to adjust
guide wheel, align with straightedge.
(E)
Layout and mark the area to
be cut using a chalk-line. Align
Pointer and Blade to chalk-line.
(D)
Tighten thumbscrew.
(F)
Start the CX-3
®
using the Engine
Start procedure in the Engine
Manual.
(G)
With the engine running adjust
the throttle approximately half-
way.
(H)
Open Cooling Supply Valve. Ver-
ify proper cooling flow and adjust
the water flow on the Blade to a
desired amount.
(I)
Adjust the throttle as needed to
make the cut. Slowly lower the
Blade until the desired level is
reached and begin the cut.