MTS Insight™ Material Testing System

Installation

35

Installation

This section provides guidelines for moving and installing your MTS Insight
material testing system.

Unless otherwise specified, it is your responsibility to off-load, unpack, and
move the equipment to the final location on your premises. This includes
insurance and safety responsibility.

Before moving the machine from the receiving area to its final location, be sure
to check the dimensions of all doors and passages through which the machine
will travel. Refer to the specification tables in the Introduction section of this
manual for dimensions.

Contents

Moving Single-Column Frames 36

Moving Double-Column Frames 38

Machine Location and Ventilation 39

Controller Connections 40

Connecting the Main Power 40

Installing Cables 46

The MTS Insight frames are heavy.

Moving the frame using improper procedures can injure personnel (for
example strained muscles and back injuries) or damage the frame.

When lifting the frame, take the appropriate precautions to prevent injuries to
yourself. Moving and positioning the MTS Insight frame must be performed by
qualified personnel only.

MTS Insight frames weigh from 50–1050 kg (110–2315 lb). Other apparatus
such as the pallet, packaging, and accessories add to the overall weight. If you
have any questions, call MTS.