Moving double-column frames, Moving double-column frames 38 – MTS Insight Material Testing Systems User Manual

Page 38

Advertising
background image

MTS Insight™ Material Testing System

38

Moving Double-Column Frames

Installation

Moving Double-Column Frames

Double-column MTS Insight load frames should only be moved using a forklift
rated at or above the weight of the machine; refer to the tables in the

Specifications

section for frame weights.

Improper lifting can damage the frame.

When lifting and moving the frame, follow these guidelines to minimize the chance
of equipment damage:

Do not lift by the top plate that joins the ends of the ball screws and side
covers.

Do not lift the machine by the side covers. The weight of the machine will
damage the side covers.

Do not lift by the ball screws.

On the forklift, adjust the distance between the forks such that they will fit
between the columns of the frame. Position the forks on the forklift as shown in
the following illustration. Allow enough room between the frame and the forklift
to allow a slight tilt once the frame is off the ground. (Weight distribution front to
back is not perfectly balanced and the frame will tilt slightly as it is lifted.) It is
also recommended to put something on the forks to minimize the chance of
damage to the frame; for example, a piece of cardboard or carpet scrap.

Lift the frame only as high as necessary to allow sufficient ground clearance on
the way to its final position. Move the frame to its final position and slowly lower
onto the ground.

CAUTION

Advertising