Main power switch (i/o) and e-stop, Main power switch (i/o) and e-stop 59 – MTS Insight - 1kN to 300kN User Manual

Page 59

Advertising
background image

Main Power Switch (I/O) and E-Stop

Insight Material Testing System

Operation

59

Main Power Switch (I/O) and E-Stop

The main power switch for the machine is on the base of the frame.

The frame is also equipped with an Emergency Stop button. The
Emergency Stop will cut the power to the motor and should be used for
emergency purposes only.

To shut down the motor power and stop the test program, press the
Emergency Stop button. Twist the switch clockwise to release it. Use the
Emergency Stop
button to shut down your test if something unexpected
should happen.

1 - 2 kN

2 EL HS and
5 - 50 kN

100 - 300 kN

Main power and
E-Stop Switches

Advertising