It is the customer's responsibility to provide suitable lifting and moving devices such as an overhead crane
and forklift. MTS supplies hoist rings (part number 100-228-534) in the "Open Me First" box (part number
100-267-481) that ships with the MTS Acumen system. These hoist rings are CE compliant. If the load frame
is moved by a forklift and no hoist rings are used, the load frame can be lifted under the cross head. Weights
and thread sizes are provided in this manual.

Insurance and Safety

Under MTS’ standard contract, the shipping terms are Ex-Works (or FOB Factory), meaning ownership and
liability for the test system transfers to the customer at MTS’ loading dock. Unless other shipping terms are
specified in a purchase order, which MTS does not dispute, the Ex-Works shipping terms apply. Under these
terms, the customer is responsible for securing the applicable transit insurance on the shipment and arranging
safe transport to the final destination. Arrangements can be made through MTS to secure insurance coverage
and shipping, at the customer’s expense.

When transporting a load frame within your own premises, you are responsible for its safe transport. Upon
special arrangements, an MTS service engineer can supervise the transportation to the load frame’s final
site. Contact the MTS Service department or your local MTS office for additional information on this service.

MTS Responsibilities

Note:Before you call MTS to arrange an installation appointment, you should have completed all the
items listed for customer responsibilities. That is, the frame should be on the support table at the final
testing location. All the boxes and components that accompanied the system are located near the
frame. All necessary electrical power, pressurized air, and cooling water are available. Personnel who
should be trained and networking support will be available at the time of installation.

MTS’ standard contract requires MTS to provide the necessary services to ensure that your test system
operates accurately. These services include:

Connect cables.

Install test area enclosure (if purchased.)

Install accessories (fixtures, load cell, grips, and so forth.).

Plug in electrical power.

Install a controller and application software.

Run a demonstration test using a supplied test specimen to show proper operation.

Provide initial training, showing basic machine functionality.

Additional services and equipment can be purchased from MTS, but these additional services must be mutually
agreed upon and specifically described in your purchase order.

Installation

When the site location is prepared and all the components are at the final location, MTS is responsible for
the complete installation of the load frame, its components, and any additional accessories that might have
been purchased. The customer should not attempt to connect and apply power to the system components
prior to the final installation and commissioning. This should only be done by MTS technicians.