Initial operation and training, Documentation – MTS Acumen Electrodynamic User Manual

Page 16

Advertising
background image

Initial Operation and Training

Once the installation is complete, MTS performs an initial operation of the load frame and a calibration check
to ensure that it is working properly and measuring accurately.

MTS also performs an initial customer demonstration and basic training that briefly describes how to operate
the system. This training, usually under four hours, is not meant to be an extensive demonstration or training
of all possible test applications. It is intended to provide an overview to give the operator a working knowledge
of basic system operation. MTS provides optional training courses for more thorough, advanced testing
applications. These courses can be purchased from MTS.

Documentation

MTS provides all the documentation required to operate the system, including manuals for the load frame
and any required software applications.

Additional copies are available and can be ordered through the MTS Sales department.

16 MTS Acumen™ Electrodynamic Test System

Responsibilities

Advertising