Site requirements checklist, Site location, Site requirements checklist 29 – MTS Criterion Series 40 User Manual

Page 29

Advertising
background image

Site Location

MTS Criterion

®

Series 40 Site Preparation Guide

Site Requirements Checklist

29

Site Requirements Checklist

The following checklist provides a quick summary of items that should be
considered when planning and preparing the site location of your test system.
Additional information regarding each item below is provided within this
manual. If you need more specific information, contact your local authorized
MTS office for assistance.

Note

This manual provides general guidelines for all types of frames.
Therefore, some of the items listed below may not pertain to your
specific system (such as smaller systems in which size and weight are
not an issue).

Site Location

The floor and table are able to support the weight of the frame and its
computer components.

The environment complies with the specifications for your specific model:

Operating temperature

Storage temperature

Humidity

Atmosphere

The required power supply is available and is compatible with the electrical
requirements for your specific model.

Electrical outlets are within the minimum distance requirement to the load
frame location.

Phone lines are located within the general testing area so that users can call
the MTS Service department directly from the testing area. It is also
suggested that network drops, or digital phone lines, be within the general
testing area.

Ceiling clearance is adequate for the load frame, including the additional
space necessary to lift and move the frame by either a forklift or crane.

Location provides sufficient accessibility for routine maintenance: 1000 mm
(3 ft).

Employees are adequately trained to operate the load frame and its computer
system.

Advertising