Transport, scope of delivery, installation, Removing transport safeguards – Retsch BB 50 User Manual

Page 17

Advertising
background image

Transport, scope of delivery, installation

17

2

Year of production

3

Part number

4

Serial number

5

Manufacturer’s address

6

CE marking

7

Disposal label

8

Bar code

9

Power version

10

Mains frequency

11

Capacity

12

Amperage

13

Number of fuses

14

Fuse type and fuse strength

In the case of questions please provide the device designation (1) or the part
number (3) and the serial number (4) of the device.

Pos : 7. 19 /0020 Übersc hrift en/1.1 Ü bersc hriften/ 1. 1 Ü berschrif ten BDA/11 Tr ans porthilf e entf ernen @ 0\ mod_1229076673566_9. doc x @ 5020 @ 2 @ 1

4.7

29B

Removing Transport Safeguards

Pos : 7. 20 /0005 RET SCH/ 0005 R ETSCH Bedienungsanlei tungen Kapit elsamml ung en/BB50/ 0006 Ver pac kung, Tr ansport und Aufs tellung/ 0005 BB50 Modul Trans port hilf e ent fer nen @ 5\ mod_1345721568835_9.doc x @ 34508 @ @ 1

Fig. 5: Carrying the machine - preparation

Before installing the carry support, remove the hopper (B) and the

grinding room cover (P).

(see chapter Cleaning

 removing the fill hopper / removing the splash-back

protection)

Before carrying the machine, remove the bolt (G), the crusher arm

(R) and the drawer (E) to make the machine lighter.

(see chapter Servicing

 replacing the breaking jaws)

B

R

E

P

G

Advertising