Cleaning, wear and service – Retsch BB 50 User Manual
Page 30
Advertising
![background image](/manuals/571037/30/background.png)
Cleaning, wear and service
30
7.2.2
53B
Replacing the front breaking jaw
NOTICE
Zircon breaking jaws (ZB) are bonded across the entire surface (ZV).
•
Have the zircon breaking jaws replaced by an authorised service
technician.
Fig. 24: Bonding the zircon breaking jaws
•
Empty the grinding chamber before replacing the breaking jaws.
•
Set the gap width to between 2 and 10 mm.
Fig. 25: Removing the bolt
•
Twist the grip of the bolt (G) until the locking pin (Gp) can be seen in the top opening of the guide.
Fig. 26: Using the (bolt) removal tool
G
Gp
G
G
Rn
ZV
ZB
Advertising