Transport, scope of delivery, installation, 9 installation of the machine – Retsch SM 200 User Manual

Page 14

Advertising
background image

Transport, scope of delivery, installation

14

•

Push the handle of the door latch (F) backwards.

•

Open the grinding chamber door (T).

•

Pull the plunger (B) into the upper latching position.

•

Place the feed hopper (R) on the device. (see diagram)

CAUTION

Until the feed hopper (R) is secured by two socket-head screws, there is a risk of it
falling out of the device.

•

Release the detent pin bolt (D) on the plunger (B).

•

Push the plunger downwards.

•

Screw the two provided socket-head screws (S) through the hinge on the
feed hopper into the enclosure.

•

At first, tighten the screws only slightly.

•

Close the grinding chamber door.

•

Pull the handle on the door latch (F) forwards until the mini detent pin (E)
engages.

•

Adjust the feed hopper until the plunger can be moved upwards and
downwards easily without jamming.

•

Tighten the two socket-head screws securely. (10 Nm)

•

Check again if the plunger moves upwards and downwards easily without
jamming.

•

Put the two protective caps (SK) onto the screws (S).

Fig. 5: Putting on the protective caps

NOTE

When new, the grinding chamber door and the handle on the door latch are
somewhat difficult to move.

Pos : 5. 27 /00005 Ü berschrif ten/ 1. 1 Ü bersc hrift en/ 1. 1 Übersc hrift en BD A/ 11 Aufs tell en des Ger ät es @ 0\ mod_1226498849756_9.doc @ 3464 @ 2 @ 1

3.9 Installation of the machine

Pos : 5. 28 /00003 St andard Kapit el/ General M odul Aufst ellungshöhe @ 0\ mod_1228918538349_9.doc @ 4724 @ @ 1

Installation height: maximum 2000 m above sea level

Pos : 5. 29 /00004 Warnhinweis e/H 0004 HIN WEIS Boden Aufst ellen Vibr ationen Boden @ 0 \ mod_1228918882236_9. doc @ 4774 @ @ 1

S

Advertising