Transport, scope of delivery, installation, 9 installation of the machine – Retsch SM 200 User Manual

Page 14

Advertising
background image

Transport, scope of delivery, installation

14

Push the handle of the door latch (F) backwards.

Open the grinding chamber door (T).

Pull the plunger (B) into the upper latching position.

Place the feed hopper (R) on the device. (see diagram)

CAUTION

Until the feed hopper (R) is secured by two socket-head screws, there is a risk of it
falling out of the device.

Release the detent pin bolt (D) on the plunger (B).

Push the plunger downwards.

Screw the two provided socket-head screws (S) through the hinge on the
feed hopper into the enclosure.

At first, tighten the screws only slightly.

Close the grinding chamber door.

Pull the handle on the door latch (F) forwards until the mini detent pin (E)
engages.

Adjust the feed hopper until the plunger can be moved upwards and
downwards easily without jamming.

Tighten the two socket-head screws securely. (10 Nm)

Check again if the plunger moves upwards and downwards easily without
jamming.

Put the two protective caps (SK) onto the screws (S).

Fig. 5: Putting on the protective caps

NOTE

When new, the grinding chamber door and the handle on the door latch are
somewhat difficult to move.

Pos : 5. 27 /00005 Ü berschrif ten/ 1. 1 Ü bersc hrift en/ 1. 1 Übersc hrift en BD A/ 11 Aufs tell en des Ger ät es @ 0\ mod_1226498849756_9.doc @ 3464 @ 2 @ 1

3.9 Installation of the machine

Pos : 5. 28 /00003 St andard Kapit el/ General M odul Aufst ellungshöhe @ 0\ mod_1228918538349_9.doc @ 4724 @ @ 1

Installation height: maximum 2000 m above sea level

Pos : 5. 29 /00004 Warnhinweis e/H 0004 HIN WEIS Boden Aufst ellen Vibr ationen Boden @ 0 \ mod_1228918882236_9. doc @ 4774 @ @ 1

S

Advertising