Operating the machine, 9 starting the grinding process – Retsch SM 200 User Manual

Page 26

Advertising
background image

Operating the machine

26

5.8 Inserting the filter unit and collecting receptacle

Pos : 8. 26 /00010 Bedi enungsanleit ung en Kapitels ammlungen/ SM200/ 0015 SM 200 Bedi enung/1565 SM 200 M odul Ri ngsieb Mont age @ 3\ mod_1280230788672_9. doc @ 22151 @ @ 1

The filter unit serves as an air outlet for the air flow generated by the comminuting
rotors.

Fig. 14: Mounting and removing the filter unit

As shown in the illustration, insert the bayonet fixing(BV) that is on the filter
unit (J) into the discharge flange(AV).

Turn the filter unit in a clockwise direction in order to engage the bayonet
fixing.

To remove the filter unit, pull the detent pin (RB) to release the bayonet
fixing (BV).

Alternatively, the collecting receptacle can be put onto the discharge flange
directly. In the latching position (BV) the air flowis prevented from escaping.

In the latching position (LS) a gap remains between the discharge flange and the
collecting receptacle remains and this allows air to flow out .

Fig. 15: Collecting receptacle and filter unit

Pos : 8. 27 /00005 Ü berschrif ten/ 1. 1 Ü bersc hrift en/ 1. 1 Übersc hrift en BD A/ 11 Mahl vorgang s tart en @ 0\ mod_1227185008190_9. doc @ 3861 @ @ 1

5.9 Starting the grinding process

Pos : 8. 28 /00010 Bedi enungsanleit ung en Kapitels ammlungen/ SM200/ 0015 SM 200 Bedi enung/1545 SM 200 M odul M ahl vorgang st art en @ 3\ mod_1280230782578_9.doc @ 22115 @ @ 1

Switch on the power switches on the back of the device.

Press the START button.

BV

H

RB

H

AV

H

LS

H

Advertising