F f 0 20.9, 0 0.0 f p f p, Bump air – RKI Instruments SDM-2009 User Manual

Page 31: Bump, Bump/cal

Advertising
background image

Bump Testing a GX-2009 • 27

for a description of calibration results.

16. The SDM-2009 will then purge the system with fresh air for the time defined by

the Air bump test parameter.

17. After the fresh air purge is complete, the GX-2009 screen will alternate

between the gas readings and the bump test or bump test and calibration
results. For a successful bump test, the gas readings at the end of the gas
application will be displayed. For a successful automatic calibration, the auto
calibration values will be displayed. For a failed bump test or automatic
calibration, the gas readings at the end of the gas application will be displayed.
If all channels passed the bump test, the BUMP

T

LED will turn solid green. If

any channels failed the bump test, the BUMP

T

LED will turn solid red. If all

channels passed the calibration, the CAL

S

LED will turn solid green. If any

channels failed the calibration, the CAL

S

LED will turn solid red.

Figure 12: Screen Indication for Passed Bump Test

Figure 13: Screen Indication for Failed Bump Test, CAL OFF

Figure 14: Screen Indication for Failed Bump Test and Passed

Automatic Calibration

BUMP AIR

P P

BUMP

CO ppm H2S ppm

CH4 %LEL OXY vol%

P P

50 11.0

BUMP

CO ppm H2S ppm

CH4 %LEL OXY vol%

47 24.0

F F

BUMP

CO ppm H2S ppm

CH4 %LEL OXY vol%

F F

0 20.9

BUMP

CO ppm H2S ppm

CH4 %LEL OXY vol%

0 0.0

F P F P

BUMP/CAL

CO ppm H2S ppm

CH4 %LEL OXY vol%

F P F P

50 12.0

BUMP/CAL

CO ppm H2S ppm

CH4 %LEL OXY vol%

50 25.0

Advertising