Conn – RKI Instruments SM-2003U User Manual

Page 23

Advertising
background image

Bump Testing Instruments • 23

the inlet fitting, and then connect the plastic fitting on the end of
the straight green tube to the exhaust fitting.

If you take more than a few seconds before continuing, the
CHARGE LED may begin blinking yellow indicating that the
calibration station is charging the battery pack in the instrument if
the instrument has a battery pack whose charge is low enough.

5. Turn on the instrument.

A GX-2003 will begin its normal startup sequence and after a
few seconds, the pump will turn off and the display will indicate it
is ready to communicate with the calibration station:

If LB Mode is activated on a GX-2003, press the POWER
ENTER button as soon as the unit turns on to avoid waiting 20
seconds for the unit to time out of the Mode Select screen to
begin its startup sequence.

A GX-2001 will begin its normal startup sequence and after a
second or two the display will indicate the following:

6. The CHARGE status LED will start blinking green and the

calibration station will take several seconds to connect to the
instrument. During this time, the CAL. status LED will blink yellow.

7. When the connection is complete, the CAL. status LED will become

solid yellow indicating that you can continue with the next step.

8. Press and hold the BUMP button for at least one second, then

release it. The bump test begins. During the bump test, the BUMP
control LED will flash green and the CAL. status LED will flash
yellow indicating that a bump test is in progress. The calibration
station will perform the following functions:

PC

TRANSMIT

STAND BY

OK

21:09

Conn