Chapter 3: installation and start up, Overview – RKI Instruments Beacon 100 User Manual

Page 11

Advertising
background image

Beacon 100 Gas Monitor Operator’s Manual

Overview • 11

Chapter 3: Installation and Start Up

Overview

This chapter describes procedures to mount the Beacon 100 Gas Monitor, make wiring
connections to the monitor, and start up the monitor.

WARNING: Perform all installation and start-up procedures in a “fresh air”

environment (known to be free of combustible gas, toxic gas, and of
normal oxygen content). The Beacon 100 is not in operation as a gas
monitoring system until the start-up procedure is complete.

Advertising